60-0078 County Court Backbone Cabling - Herkese Açık Proje Sahası
-
09th Ocak 2025, PUBLIC LIFTS
The public lifts have been isolated from levels 1 and 2.
Any change in level will need to be through the construction lift from ground level.
ANY ISSUES CONTACT JARRYD 0400 283 309 -
24th Aralık 2024, County court in operation
All, currently looks like court is operating. Please be mindful of movements around the court at this time.
-
05th Aralık 2024, Before the weekend
Before the weekend can all trades please ensure general waste is disposed of an all spoil is loaded out or consolidated.
pits and trenches need also to be filled or barricaded for safety to others.
Geçerli Saha Hava Durumu
Son Güncelleme Saati: 02:21
Sıcaklık: 13C (App 11C)
Rüzgar Hızı: 6KMH
Maks. Rüzgar: 11KMH @01:21
Saat 9'dan beri yağmurlu: 0,0mm
Min Sıcaklık: 13C @02:19
Maks Sıcaklık: 19C @15:13 11.01.2026
Bora: 9KMH
Maks Bora: 13KMH @01:21
Gözlem Konumu - Melbourne (Olympic Park), VICTORIA
Zaman Dilimi - Doğu Avustralya Standart Saati
Tahmin - Pazartesi, 12 Ocak
Partly cloudy.
Min: 16C Maks: 24C
Yağmur İhtimali: 20%
Tahmin Konumu - Melbourne, VICTORIA
Zaman Dilimi - Doğu Avustralya Standart Saati
Yarın - Salı, 13 Ocak
Possible shower.
Min: 16C Maks: 25C
Yağmur İhtimali: 40%
Beklenen Yağmur: 0 kime 2mm
Bu sahanın KKD Gereksinimlerini biliyor musunuz?
Sahadaki ilk gününüzde doğru güvenlik ekipmanlarına sahip olduğunuzdan emin olun.
Sahaya geldiğinizde kısa süre içinde çalışmaya başlamak için hazırlanın.
Saha kaydınızı çevrimiçi tamamlayın ve zamandan kazanın.
Bu sahanın KKD Gereksinimlerini biliyor musunuz?
Sahadaki ilk gününüzde doğru güvenlik ekipmanlarına sahip olduğunuzdan emin olun.
Sahaya geldiğinizde kısa süre içinde çalışmaya başlamak için hazırlanın.
Saha kaydınızı çevrimiçi tamamlayın ve zamandan kazanın.