60-0078 County Court Backbone Cabling - Sitio de proyecto público
-
09th enero 2025, PUBLIC LIFTS
The public lifts have been isolated from levels 1 and 2.
Any change in level will need to be through the construction lift from ground level.
ANY ISSUES CONTACT JARRYD 0400 283 309 -
24th diciembre 2024, County court in operation
All, currently looks like court is operating. Please be mindful of movements around the court at this time.
-
05th diciembre 2024, Before the weekend
Before the weekend can all trades please ensure general waste is disposed of an all spoil is loaded out or consolidated.
pits and trenches need also to be filled or barricaded for safety to others.
Tiempo en Obra actual
Última actualización el: 2:21 AM
Temperatura: 13C (Aplicación 11C)
Velocidad del viento: 6MPH
Máx. Viento: 11MPH @1:21 AM
Lluvia desde las 9 a.m.: 0.0mm
Temp mín: 13C @2:19 AM
Temp máx: 19C @3:13 PM 1/11/2026
Ráfaga: 9MPH
Ráfagas máx: 13MPH @1:21 AM
Lugar de observación - Melbourne (Olympic Park), VICTORIA
Zona horaria - hora estándar de Australia oriental
Pronóstico - lunes, 12 enero
Partly cloudy.
Mín: 16C Máx: 24C
Probabilidad de lluvia: 20%
Lugar de la previsión - Melbourne, VICTORIA
Zona horaria - hora estándar de Australia oriental
Mañana - martes, 13 enero
Possible shower.
Mín: 16C Máx: 25C
Probabilidad de lluvia: 40%
Se esperan precipitaciones: 0 para 2mm
¿Conoce los requisitos de PPE para esta Obra?
Asegúrese de que cuento con el equipo de seguridad correcto para su primer día en la obra.
Empiece a trabajar en cuanto llegue a la obra.
Complete su registro de la obra en línea a su conveniencia y ahorre tiempo.
¿Conoce los requisitos de PPE para esta Obra?
Asegúrese de que cuento con el equipo de seguridad correcto para su primer día en la obra.
Empiece a trabajar en cuanto llegue a la obra.
Complete su registro de la obra en línea a su conveniencia y ahorre tiempo.