60-0078 County Court Backbone Cabling - Lokalizacja publicznego projektu
-
09th stycznia 2025, PUBLIC LIFTS
The public lifts have been isolated from levels 1 and 2.
Any change in level will need to be through the construction lift from ground level.
ANY ISSUES CONTACT JARRYD 0400 283 309 -
24th grudnia 2024, County court in operation
All, currently looks like court is operating. Please be mindful of movements around the court at this time.
-
05th grudnia 2024, Before the weekend
Before the weekend can all trades please ensure general waste is disposed of an all spoil is loaded out or consolidated.
pits and trenches need also to be filled or barricaded for safety to others.
Aktualna pogoda w lokalizacji
Ostatnia aktualizacja w: 02:21
Temperatura: 13C (Aplikacja 11C)
Prędkość wiatru: 6KMH
Maks. Wiatr: 11KMH @01:21
Deszcz od 9:00: 0,0mm
Min. temp.: 13C @02:19
Maks. temp.: 19C @15:13 11.01.2026
Powiew: 9KMH
Maks. powiew: 13KMH @01:21
Lokalizacja spostrzeżenia - Melbourne (Olympic Park), VICTORIA
Strefa czasowa - czas wschodnioaustralijski standardowy
Prognoza - poniedziałek, 12 stycznia
Partly cloudy.
Min.: 16C Maks.: 24C
Prawdopodobieństwo deszczu: 20%
Lokalizacja prognozy - Melbourne, VICTORIA
Strefa czasowa - czas wschodnioaustralijski standardowy
Jutro - wtorek, 13 stycznia
Possible shower.
Min.: 16C Maks.: 25C
Prawdopodobieństwo deszczu: 40%
Prognozowane opady deszczu: 0 do 2mm
Czy znasz wymagania dotyczące środków ochrony indywidualnej dla tej lokalizacji?
Upewnij się, że posiadasz właściwy sprzęt BHP na pierwszy dzień w lokalizacji.
Rozpocznij pracę szybciej po przybyciu do lokalizacji
Dokonaj rejestracji online w lokalizacji w wolnej chwili, aby zaoszczędzić czas.
Czy znasz wymagania dotyczące środków ochrony indywidualnej dla tej lokalizacji?
Upewnij się, że posiadasz właściwy sprzęt BHP na pierwszy dzień w lokalizacji.
Rozpocznij pracę szybciej po przybyciu do lokalizacji
Dokonaj rejestracji online w lokalizacji w wolnej chwili, aby zaoszczędzić czas.