60-0078 County Court Backbone Cabling - सार्वजनिक प्रोजेक्ट साइट
-
09th जनवरी 2025, PUBLIC LIFTS
The public lifts have been isolated from levels 1 and 2.
Any change in level will need to be through the construction lift from ground level.
ANY ISSUES CONTACT JARRYD 0400 283 309 -
24th दिसम्बर 2024, County court in operation
All, currently looks like court is operating. Please be mindful of movements around the court at this time.
-
05th दिसम्बर 2024, Before the weekend
Before the weekend can all trades please ensure general waste is disposed of an all spoil is loaded out or consolidated.
pits and trenches need also to be filled or barricaded for safety to others.
साइट का मौजूदा मौसम
अंतिम बार अपडेट किया गया: 02:21
तापमान: 13C (ऐप 11C)
हवा की गति: 6KMH
अधिकतम हवा: 11KMH @01:21
सुबह 9 बजे से बारिश: 0.0mm
न्यूनतम तापमान: 13C @02:19
अधिकतम तापमान: 19C @15:13 11-01-2026
गस्ट: 9KMH
अधिकतम गस्ट: 13KMH @01:21
ऑब्जरवेशन की लोकेशन- Melbourne (Olympic Park), VICTORIA
समय क्षेत्र - ऑस्ट्रेलियाई पूर्वी मानक समय
पूर्वानुमान - सोमवार, 12 जनवरी
Partly cloudy.
न्यूनतम: 16C अधिकतम: 24C
बारिश की संभावना: 20%
पूर्वानुमान वाली लोकेशन - Melbourne, VICTORIA
समय क्षेत्र - ऑस्ट्रेलियाई पूर्वी मानक समय
कल - मंगलवार, 13 जनवरी
Possible shower.
न्यूनतम: 16C अधिकतम: 25C
बारिश की संभावना: 40%
अपेक्षित बारिश: 0 से 2mm
क्या आप इस साइट के लिए आवश्यक PPE के बारे में जानते हैं?
सुनिश्चित करें कि आपके पास साइट पर पहले दिन के लिए सही सुरक्षा इक्विपमेंट हैं।
जब आप साइट पर पहुंचें, तो जल्द से जल्द काम करना शुरू कर दें।
अपनी सुविधा के अनुसार अपना साइट रजिस्ट्रेशन ऑनलाइन पूरा करें और अपना समय बचाएँ।
क्या आप इस साइट के लिए आवश्यक PPE के बारे में जानते हैं?
सुनिश्चित करें कि आपके पास साइट पर पहले दिन के लिए सही सुरक्षा इक्विपमेंट हैं।
जब आप साइट पर पहुंचें, तो जल्द से जल्द काम करना शुरू कर दें।
अपनी सुविधा के अनुसार अपना साइट रजिस्ट्रेशन ऑनलाइन पूरा करें और अपना समय बचाएँ।