09th ianuarie 2025, PUBLIC LIFTS
The public lifts have been isolated from levels 1 and 2.
Any change in level will need to be through the construction lift from ground level.
ANY ISSUES CONTACT JARRYD 0400 283 309 -
24th decembrie 2024, County court in operation
All, currently looks like court is operating. Please be mindful of movements around the court at this time.
-
05th decembrie 2024, Before the weekend
Before the weekend can all trades please ensure general waste is disposed of an all spoil is loaded out or consolidated.
pits and trenches need also to be filled or barricaded for safety to others.
Condiții meteo curente la șantier
Ultima actualizare la: 02:21
Temperatură: 13C (Aplicație 11C)
Viteza vântului: 6KMH
Max. Vânt: 11KMH @01:21
Ploaie de la 9 AM: 0,0mm
Temp min: 13C @02:19
Temp max: 19C @15:13 11.01.2026
Rafală: 9KMH
Rafală max: 13KMH @01:21
Locație observație - Melbourne (Olympic Park), VICTORIA
Fus orar - Ora standard a Australiei Orientale
Prognoză - luni, 12 ianuarie
Partly cloudy.
Min: 16C Max: 24C
Șanse de ploaie: 20%
Locație prognoză - Melbourne, VICTORIA
Fus orar - Ora standard a Australiei Orientale
Mâine - marți, 13 ianuarie
Possible shower.
Min: 16C Max: 25C
Șanse de ploaie: 40%
Precipitații așteptate: 0 la 2mm
Cunoașteți cerințele EIP pentru acest șantier?
Asigurați-vă că aveți echipamentul de siguranță corect pentru prima zi la locație.
Începeți să lucrați mai devreme atunci când ajungeți în locație.
Finalizați înregistrarea la șantier online când doriți și economisiți timp.
Cunoașteți cerințele EIP pentru acest șantier?
Asigurați-vă că aveți echipamentul de siguranță corect pentru prima zi la locație.
Începeți să lucrați mai devreme atunci când ajungeți în locație.
Finalizați înregistrarea la șantier online când doriți și economisiți timp.