60-0078 County Court Backbone Cabling - Offentlig prosjektsted
-
09th januar 2025, PUBLIC LIFTS
The public lifts have been isolated from levels 1 and 2.
Any change in level will need to be through the construction lift from ground level.
ANY ISSUES CONTACT JARRYD 0400 283 309 -
24th desember 2024, County court in operation
All, currently looks like court is operating. Please be mindful of movements around the court at this time.
-
05th desember 2024, Before the weekend
Before the weekend can all trades please ensure general waste is disposed of an all spoil is loaded out or consolidated.
pits and trenches need also to be filled or barricaded for safety to others.
Vær på anleggsted
Sist oppdatert kl.: 02:21
Temperatur: 13C (App 11C)
Vindfart: 6KMH
Maks. Vind: 11KMH @01:21
Regn side 09.00: 0,0mm
Min. temperatur: 13C @02:19
Maks. temperatur: 19C @15:13 11.01.2026
Vindkast: 9KMH
Maks. vindkast: 13KMH @01:21
Observasjonssted - Melbourne (Olympic Park), VICTORIA
Tidssone - austaustralsk standardtid
Værmelding – måndag, 12 januar
Partly cloudy.
Min.: 16C Maks.: 24C
Sjanse for regn: 20%
Sted for værmelding – Melbourne, VICTORIA
Tidssone - austaustralsk standardtid
I morgen - tysdag, 13 januar
Possible shower.
Min.: 16C Maks.: 25C
Sjanse for regn: 40%
Forventet nedbør: 0 til 2mm
Vet du om PVU-kravene for dette anlegget?
Sørg for at du har riktig sikkerhetsutstyr for den første dagen på anleggsplassen.
Kom i gang med arbeidet tidligere når du ankommer anleggsplassen.
Fullfør nettstedsregistreringen din online når det passer deg og spar tid.
Vet du om PVU-kravene for dette anlegget?
Sørg for at du har riktig sikkerhetsutstyr for den første dagen på anleggsplassen.
Kom i gang med arbeidet tidligere når du ankommer anleggsplassen.
Fullfør nettstedsregistreringen din online når det passer deg og spar tid.