23-7366 10 Browning street Recladding
Buletine recente
  • 05th decembrie 2024, Before the weekend

    Before the weekend can all trades please ensure general waste is disposed of an all spoil is loaded out or consolidated.
    pits and trenches need also to be filled or barricaded for safety to others.

  • 22nd martie 2024, Good Morning and Welcome to Browning Street Re Clad Project BEWARE OF PUBLIC INTERACTION BEWARE OF LIVE TRAFFIC AND MOVEMENTS

    BEWARE OF INCLEMENT WEATHER WORK TO CONDITIONS

    Works Today -
    TCI - Set up and maintain carpark lane closure to Entrance,Exist and Ramp EWP and ropes Works

    Access Scaffolding - Scaffold removal to North and West Wall Corner South Building

    Kaybre Painting - Start Painting Blade Sign and Bulkheads to undercroft area

    Glenview Developments - Continue Bulkhead works and South Foyer

    QS Cladding - EWP Works to East Face Carpark top area and ramp
    Continue Panel works East face North Building
    Continue Caulking Works
    Continue works to Bottle O Signage

    Safety-

    MAKE SURE YOU FOLLOW YOUR SWMS

    Set up work zones signage if required barricade with bollard and flagging or water barriers

    Roof and Ropes works - Ensure you are harnessed and attached to either rope access or harness and fall restraint too static line if you are working closer then 2m from an live edge

    Drilling overhead - Ensure you adapt Double protection either face shield or goggles

    Live Traffic - beware of live traffic and movement, delineate work area,
    Follow and adhere to your SWMS

    Pedestrian interaction - beware of public interaction , set up and maintain exclusion zones, correct use of spotters, positive communication between all parties

    Plant and People - Prestart plant and machinery before works are started, Ticketed compliment operators only, positive communication between plant and people visual and verbal, delineate work area

    Uneven Surfaces - Eyes on path , mind on task, ensure secure footing when working in and around site

    House Keeping - Maintain good house keeping , tidy up as you go along,ensure you allow enough time at the end of each shift to tidy properly

    Manual Handling - Correct posture and lift technique, team lifts or mechanical aid, when performing a team lift ensure clear and positive communication is used

    Dehydration - Fluids regularly , sunblock available, shade breaks if required , look out for your mates

  • 29th ianuarie 2023, machinery

    Please make sure you look for machinery working in between buildings prior to access please

Prognoza meteo șantier
Condiții meteo curente la șantier

Ultima actualizare la: 01:21
Temperatură: 25C (Aplicație 29C)
Viteza vântului: 4KMH
Max. Vânt: 6KMH @00:21
Ploaie de la 9 AM: 0,2mm
Temp min: 25C @01:20
Temp max: 32C @11:54 11.01.2026
Rafală: 6KMH
Rafală max: 7KMH @00:21


Observație obținută de la - Bureau of Meteorology
Locație observație - Brisbane, QUEENSLAND
Fus orar - Ora standard a Australiei Orientale
Prognoză - luni, 12 ianuarie

Showers.
Min: 22C Max: 29C
Șanse de ploaie: 80%
Precipitații așteptate: 0 la 15mm


Prognoză obținută de la - Bureau of Meteorology
Locație prognoză - Brisbane, QUEENSLAND
Fus orar - Ora standard a Australiei Orientale
Mâine - marți, 13 ianuarie

Possible shower.
Min: 23C Max: 30C
Șanse de ploaie: 40%
Precipitații așteptate: 0 la 1mm


Documente importante aferente locației
Nou în locație?

Cunoașteți cerințele EIP pentru acest șantier?

Asigurați-vă că aveți echipamentul de siguranță corect pentru prima zi la locație.

Vizualizare cerințele șantierului privind IPE

Începeți să lucrați mai devreme atunci când ajungeți în locație.

Finalizați înregistrarea la șantier online când doriți și economisiți timp.

Începeți înregistrarea

Nou în locație?

Cunoașteți cerințele EIP pentru acest șantier?

Asigurați-vă că aveți echipamentul de siguranță corect pentru prima zi la locație.

Vizualizare cerințele șantierului privind IPE

Nou în locație?

Începeți să lucrați mai devreme atunci când ajungeți în locație.

Finalizați înregistrarea la șantier online când doriți și economisiți timp.

Începeți înregistrarea

;