23-7366 10 Browning street Recladding
近期公告
  • 05th 十二月 2024, Before the weekend

    Before the weekend can all trades please ensure general waste is disposed of an all spoil is loaded out or consolidated.
    pits and trenches need also to be filled or barricaded for safety to others.

  • 22nd 三月 2024, Good Morning and Welcome to Browning Street Re Clad Project BEWARE OF PUBLIC INTERACTION BEWARE OF LIVE TRAFFIC AND MOVEMENTS

    BEWARE OF INCLEMENT WEATHER WORK TO CONDITIONS

    Works Today -
    TCI - Set up and maintain carpark lane closure to Entrance,Exist and Ramp EWP and ropes Works

    Access Scaffolding - Scaffold removal to North and West Wall Corner South Building

    Kaybre Painting - Start Painting Blade Sign and Bulkheads to undercroft area

    Glenview Developments - Continue Bulkhead works and South Foyer

    QS Cladding - EWP Works to East Face Carpark top area and ramp
    Continue Panel works East face North Building
    Continue Caulking Works
    Continue works to Bottle O Signage

    Safety-

    MAKE SURE YOU FOLLOW YOUR SWMS

    Set up work zones signage if required barricade with bollard and flagging or water barriers

    Roof and Ropes works - Ensure you are harnessed and attached to either rope access or harness and fall restraint too static line if you are working closer then 2m from an live edge

    Drilling overhead - Ensure you adapt Double protection either face shield or goggles

    Live Traffic - beware of live traffic and movement, delineate work area,
    Follow and adhere to your SWMS

    Pedestrian interaction - beware of public interaction , set up and maintain exclusion zones, correct use of spotters, positive communication between all parties

    Plant and People - Prestart plant and machinery before works are started, Ticketed compliment operators only, positive communication between plant and people visual and verbal, delineate work area

    Uneven Surfaces - Eyes on path , mind on task, ensure secure footing when working in and around site

    House Keeping - Maintain good house keeping , tidy up as you go along,ensure you allow enough time at the end of each shift to tidy properly

    Manual Handling - Correct posture and lift technique, team lifts or mechanical aid, when performing a team lift ensure clear and positive communication is used

    Dehydration - Fluids regularly , sunblock available, shade breaks if required , look out for your mates

  • 29th 一月 2023, machinery

    Please make sure you look for machinery working in between buildings prior to access please

现场天气预报
当前现场天气

最近更新: 1:21
温度: 25C (应用程序 29C)
风速: 4KMH
最大 风: 6KMH @0:21
自上午9点开始降雨: 0.2mm
最低温度: 25C @1:20
最高温度: 32C @11:54 2026/1/11
阵风: 6KMH
最大风力: 7KMH @0:21


观测信息来自 - Bureau of Meteorology
观测位置 - Brisbane、QUEENSLAND
时区 - 澳大利亚东部标准时间
预测 - 星期一、12 一月

Showers.
最低: 22C 最大: 29C
可能有雨。: 80%
预计降雨: 0 至 15mm


预测信息来自 - Bureau of Meteorology
预测位置 - Brisbane、QUEENSLAND
时区 - 澳大利亚东部标准时间
明天 - 星期二, 13 一月

Possible shower.
最低: 23C 最大: 30C
可能有雨。: 40%
预计降雨: 0 至 1mm


重要现场文件
刚到这个现场吗?

您知道这个现场的PPE要求吗?

确保您在现场的第一天有正确的安全设备。

查看现场PPE要求

到达现场后尽快开始工作。

在您方便的时候在线完成现场注册,节省您的时间。

开始注册

刚到这个现场吗?

您知道这个现场的PPE要求吗?

确保您在现场的第一天有正确的安全设备。

查看现场PPE要求

刚到这个现场吗?

到达现场后尽快开始工作。

在您方便的时候在线完成现场注册,节省您的时间。

开始注册

;