15th 10月 2025, Good Morning and Welcome to The GYG Coorparoo Project
Please Ensure you read the Prestart Attachment associated with this Bulletin
GENERAL SITE RULES.
Ensure all rubbish is placed in the bins provided.
Keep all amenities clean and tidy.
Mandatory PPE to be worn at all times.
Permits must be obtained before works commence.
(Excavation, hot work, high risk, ETC )
Observe and abide by all policies and procedures stated in your SJ HIGGINS induction.
Follow all procedures in your relevant SWMS.
Ensure you are only preforming tasks within your own SWMS.
Ensure any or all chemicals are noted in your MSDS before bringing onto site, Theses need to be placed on a register in Hammertech.
Ensure all leads are tested and tagged before being brought onto site. These need to on an electrical register and placed in Hammertech.
Materials an equipment left onsite is your own responsibility.
NO WORK SETUPS OR MATERIALS TO BE WITHIN 1.2M OF TEMP SWITCHBOARDS -
05th 12月 2024, Before the weekend
Before the weekend can all trades please ensure general waste is disposed of an all spoil is loaded out or consolidated.
pits and trenches need also to be filled or barricaded for safety to others. -
29th 1月 2023, machinery
Please make sure you look for machinery working in between buildings prior to access please
現在の現場の天気
利用できません
タイムゾーン - オーストラリア東部標準時
予測 - 月曜日, 12 1月
Showers.
分: 22C マックス: 29C
降雨の可能性: 80%パーセント
予想降雨量: 0 に 15mm
予測場所 - Brisbane, QUEENSLAND
タイムゾーン - オーストラリア東部標準時
明日 - 火曜日, 13 1月
Possible shower.
分: 23C マックス: 30C
降雨の可能性: 40%パーセント
予想降雨量: 0 に 1mm