24-7382 GYG Burpengary
近期公告
  • 05th 十二月 2024, Before the weekend

    Before the weekend can all trades please ensure general waste is disposed of an all spoil is loaded out or consolidated.
    pits and trenches need also to be filled or barricaded for safety to others.

  • 19th 九月 2024, Site Rules Burpengary GYG

    General Site Rules

    Ensure all rubbish is placed in the bins provided.

    Keep all amenities clean and tidy.

    Permits must be obtained before works can commence. (Excavation, Hot Works, High Risk, ETC).
    Observe and abide by all policies and procedures outlined in SJ Higgins induction.

    Follow all procedures outlined in your trade specific SWMS.

    Ensure any or all chemicals have appropriate MSDS are registered on Hammertech and are stored as per regulation.

    Ensure you are only preforming trades specific tasks that fall in line with your relevant SWMS.

    Ensure all electrical equipment has been tested and tagged and are placed on Hammertech register.

    Any tools, materials and or equipment left onsite will not be the responsibility of SJ Higgins, any items noted are Soley the responsibility of the supplier or subcontractor.

    The inductee is responsible for complying with all WOH&S requirements including legislation.

  • 29th 一月 2023, machinery

    Please make sure you look for machinery working in between buildings prior to access please

现场天气预报
当前现场天气

不可用


观测信息来自 - 不可用
时区 - 澳大利亚东部标准时间
预测 - 星期一、12 一月

不可用


时区 - 澳大利亚东部标准时间
明天 - 星期二, 13 一月

不可用


重要现场文件
刚到这个现场吗?

您知道这个现场的PPE要求吗?

确保您在现场的第一天有正确的安全设备。

查看现场PPE要求

到达现场后尽快开始工作。

在您方便的时候在线完成现场注册,节省您的时间。

开始注册

刚到这个现场吗?

您知道这个现场的PPE要求吗?

确保您在现场的第一天有正确的安全设备。

查看现场PPE要求

刚到这个现场吗?

到达现场后尽快开始工作。

在您方便的时候在线完成现场注册,节省您的时间。

开始注册

;